Telekosang Hydro One Sdn Bhd (THOSB) and Telekosang Hydro Two Sdn Bhd (THTSB) is a Joint-Venture Company with Inno Hydropower (T) Sdn. Bhd. (wholly owned by Yayasan Sabah) that was established to primarily focus on the development, ownership and operation of Small Hydro Power (SHP) plants along Telekosang River, Tenom Sabah. The proposed collaboration is aimed among others, at enhancing production of renewable energy resources to cater for the improvement of electricity security and socio development in the state of Sabah.



THE PROJECT

Telekosang river terrain Telekosang river terrain

The development of an integrated 40MW Small Hydropower (SHP) scheme is located on the Telekosang River in Tenom, Sabah. The Project will be designed as a cascading hydroelectric scheme where both Plant 1 and Plant 2 are situated along the same river such that the run-off discharge of Plant 2 will be used as the water intake source for the Plant 1.

Cascading small hydroelectric scheme Cascading small hydroelectric scheme

PLANT TELEKOSANG HYDRO ONE TELEKOSANG HYDRO TWO
Capacity
Installed Power 24MW 16MW
Declared Availability (p.a.) 147,168 MWh 98,112 MWh
Term 21 years 21 years
FiT Rate 24 sen 24 sen
Scheduled COD July 2021 July 2021
Hydrology
Catchment Area 828 km2 620 km2
Design Flow 19.4 m3/s 15.0 m3/s
Gross Head 154 m 132 m
River Intake Gravity Weir Gravity Weir
Water Conduit
Turbine Type Francis Francis
Generator Type Synchronous Synchronous


Progress Diagram

Telekosang Hydro One Progress Diagram
(Percentage Completion)

* As of 15 August 2021

Progress Diagram

Telekosang Hydro Two Progress Diagram
(Percentage Completion)

* As of 15 August 2021


Project Status as of 31 May 2022

Workplace MSS Tenom TH1 Powerhouse TH2 Powerhouse Transmission Line
×

MSS Tenom (99%)

Installation of Gas Insulated Switchgears (GIS) – Apr ‘22

Cinque Terre
×

MSS Tenom (99%)

Installation of Gas Insulated Switchgear (GIS) – Apr ‘22

Cinque Terre
×

MSS Tenom (99%)

GIS – Tx Cable Installation – Apr ‘22

Cinque Terre

Archive

×

Transmission Line (TH1:70%, TH2:65%)

Laying of underground cables – May’22

Cinque Terre
×

Transmission Line (TH1:70%, TH2:65%)

Laying of underground cables – May’22

Cinque Terre
×

Transmission Line (TH1:70%, TH2:65%)

Transmission line disconnector switch Installation – Apr’22

Cinque Terre

Archive


TELEKOSANG ASEAN GREEN SRI SUKUK (TAGSS)
& TELEKOSANG ASEAN GREEN JUNIOR BONDS (TAGJB)

Telekosang Hydro One Sdn Bhd successfully issued its Islamic medium-term notes (IMTN) of RM470 million in nominal value (Ringgit Malaysia Four Hundred and Seventy million), which is the world’s first greenfield mini-hydro green SRI Sukuk, under the Shariah principle of Wakalah Bi Al-Istithmar. It is compliance with the Sustainable Responsible Investment (SRI) SUkuk Framework under the Securities Commission Malaysia (SC) Guidelines.



TAGSS TAGJB
Facility ASEAN Green SRI Sukuk ASEAN Green Junior Bonds
Rating AA3 A2
Amount RM 470mil RM 120mil

Project Funding & Economics

Utilisation of TAGSS Proceeds

Project Funding & Economics

Utilisation of TAGJB Proceeds


Impact Reporting

4 turbines rated at 40 MW
capacity of the SHP Plants
31 December 2022
expected completion date of Project
Expected Power output of 245,280 MWh
per annum (declared annual availability)
172,909 tonnes of CO2 avoided annually
based on IRENA @ factor of 0.705
Up to 1000 Jobs
supported during construction

Project Reporting

CONTACT

Lets get in touch. Send us a message:

THE TEAM

Telekosang Hydro One Sdn. Bhd.
Telekosang Hydro Two Sdn. Bhd.

A-2-13 Plaza Damas 3,
63 Jalan Sri Hartamas,
Taman Sri Hartamas,
50480 Kuala Lumpur,
Malaysia.
Tel: 03 6211 5788
Fax: 03 6211 1788
Email: telekosanghydro@jentayucapital.com